12
OWNER’S MANUAL |
THERMOMASSEUR
®
1 800 463.2187
From 8 a.m. to 8 p.m. Monday to Thursday (EST) . From 8 a.m. to 5 p.m. on Friday (EST)
Printed in Canada. Copyright © May 2017 BainUltra Inc. All rights reserved. 45220001
Some products, specifications, and services mentioned in this manual are described in pending patent applications or are protected by patents.
THERMOMASSEUR
®
UNDERMOUNTED BATH
PLUMBING INSTALLATION
1. INSTALLATION
1-1
Prepare the site to connect the plumbing
and turbine.
1-2
Build the (2” x 3”) levelled wooden struc-
ture with plywood as in Detail A, taking
into account the thickness of the ceramic
tiles and the plywood as well as the height
of the bath.
NOTE:
Plan air intake for turbine.
1-3
Ensure bath is levelled.
NOTE:
Protect turbine as you insert bath.
1-4
Conduct plumbing and turbine connection.
1-5
Enclose contour of podium using plywood.
NOTE:
Plan air intake for turbine.
1-6
Install desired finishing materials (ceramic
tiles, granit, marble or other) and top
surface and siding of podium.
1-7
Apply seal to junction of ceramic tiles with
ceramic grout and/or silicone.
IMPORTANT
• Bath must be completely supported by podium making sure the edge rests entirely on the structure.
• Bath must be levelled.
• Bath is molded with a slope toward drain. If bath is levelled in respect to the deck, the water will
drain completely.
Edge of bath
Ceramic, marble,
granit or other
Plywood
1"
[2.5 cm]
2” x 3”
structure
Detail A
UNDERMOUNTED BATH - PLUMBING INSTALLATION
BALNEO
®
, AMMA
®
& ORIGAMI FREESTANDING
PARTS AND TOOLS