background image

16553

Call Us First!

DO NOT RETURN TO STORE.

For questions on assembly or for general inquiries, you may contact us in the following ways:

Call customer service:

 1-877-743-3400

Did you enjoy building your shed? 

JOIN OUR TEAM

AND MAKE UP TO $1,500/WEEK*

o

r

 

v

is

i

t b

a

cky

ard

in

st

a

l

l

er

.

c

o

m

Flexible schedule 

No selling,

just building

Bonus incentives 

available

S

c

a

n

 t

h

f

 ow

c

o

de 

t

a

p

ply

 

to

d

a

y

.

INSTALLERS

WANTED

*based on number of completed installations

Call a Recruiter Today!  734-365-7000

visit us online at

help.backyardproducts.com

AVOID THE WAIT!

Submit a help request

Answers to frequently asked questions

Live chat with an agent

Summary of Contents for SHEDMASTER HOMESTEAD

Page 1: ...M AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALLERS WANTED based...

Page 2: ...C Puerto Rico 18 or older to participate Taxes on prize are responsibility of winner Odds of winning depend on the number of eligible reviews received Void where prohibited For complete details and of...

Page 3: ...omer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to...

Page 4: ...on Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible...

Page 5: ...TERIALS This shed includes a floor See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your floor as this will vary depending on your specific si...

Page 6: ...3 8 5 1 x 10 2 x 237 2 cm FYA x2 19 32 x 3 1 2 x 71 7 8 1 5 x 8 9 x 182 6 cm JGL WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size 1 x 4 3 4 x 3 1 2 1 9 x 8 9 cm 2 x 4 1 1 2 x 3 1 2 3 8 x 8 9...

Page 7: ...x2 48 x 72 121 9 x 182 9 cm x4 46 1 8 x 72 117 2 x 182 9 cm x2 11 7 8 x 72 30 2 x 182 9 cm x2 15 7 8 x 72 40 3 x 182 9 cm x1 23 7 8 x 72 60 6 x 182 9 cm x1 LEFT DOOR x1 RIGHT DOOR FLOOR PANELS PANEL P...

Page 8: ...2 7 6 x 217 2 cm x4 Metal Gable Drip Edge x4 LBS x4 LBS x215 2 5 1 cm x45 3 7 6 cm 3 7 6 cm 2 5 1 cm x105 1 1 2 3 8 cm x2 Transom Window x12 3 4 1 9 cm x4 x1 1 1 4 x2 Handle locking with Screws x24 2...

Page 9: ...LEVELING MATERIALS Gravel 2x4 Treated Lumber Solid Masonry Blocks in 1 2 4 or 8 thickness Asphalt Shingles PREFERRED METHOD 4x4 TREATED RUNNERS MATERIAL REQUIRED x2 4 x 4 x 10 10 1 x 10 1 x 304 8 cm...

Page 10: ...anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to cure for at least seven 7 days Caulk Use treated lumber supplied in kit x1 A Actu...

Page 11: ...2 3 nails at each mark and 4 3 nails at seams PARTS REQUIRED NOTE Look for Stamp FLOOR FRAME BEGIN HINT For easier nailing stand on frame x40 3 7 6 cm Nails Flush at ends Flush at ends Center on marks...

Page 12: ...approximately 151 9 16 385 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame Secure the...

Page 13: ...e GAA as a spacer for consistent 3 4 measurement Secure panel with 2 nails spaced 6 apart on edges and 12 apart inside panel PARTS REQUIRED x53 2 5 1 cm FLOOR PANELS DOOR 5 8 x 48 x 96 1 6 x 121 9 x 2...

Page 14: ...35 3 cm x1 PARTS REQUIRED 2 FLOOR PANELS DOOR 6 15 2 cm 3 4 Gauge Block 12 30 5 cm Install 23 7 8 x 92 5 8 use GAA and 44 5 8 x 96 floor panels flush to the installed panels Secure panels with 2 nails...

Page 15: ...that the floor frame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure...

Page 16: ...cal side walls PARTS REQUIRED x40 3 7 6 cm SIDE WALLS UM x5 TJ TJ HINT For easier nailing stand on frame BEGIN 1 Orient parts on edge on floor Measure and mark Secure with 2 3 nails at each mark x10 2...

Page 17: ...part on inside of panel Repeat steps to build your 2nd side wall SIDE WALLS 46 1 8 x 72 117 2 x 182 9 cm x2 3 4 GAUGE BLOCK Your 2 side walls are now assembled FINISH Carefully flip the wall over For...

Page 18: ...ED x28 3 7 6 cm HINT For easier nailing stand on frame BEGIN 1 Orient parts on edge on floor Measure and mark Secure with 2 3 nails at each mark and 4 3 nails at seams UM x6 JBD TJ JBD TJ x6 2 x 4 x 6...

Page 19: ...to frame with 2 nails spaced 6 apart along edges and 12 apart on inside of panel BACK WALL PARTS REQUIRED x122 2 5 1 cm 3 4 GAUGE BLOCK 23 7 8 x 72 60 6 x 182 9 cm x1 Flush Flush Flush 48 x 72 121 9 x...

Page 20: ...BEGIN 1 Orient parts on edge on floor Measure and mark Secure with 2 3 nails at each mark and 4 3 nails at seam KHA KHA UM x6 GBD GSB HINT For easier nailing stand on frame Flush Flush Flush Flush Sea...

Page 21: ...d 6 apart 2 4 3 Install temporary support OO to frame with 3 screws Install 2 11 7 8 x 72 panels flush to installed panels and flush to top of frame Secure panels with 2 nails spaced 6 apart 15 7 8 x...

Page 22: ...e of wall panels Fig A Fig B Secure HJ with 5 2 nails spaced evenly Fig B Front wall panel HJ HJ Flush Wall Panel HJ Fig A 2 5 1 cm Nails 2 5 1 cm x5 Your front wall is now assembled FINISH Carefully...

Page 23: ...floor with 3 nails Fig A 3 7 6 cm x8 x2 2 5 1 cm x18 RIGHT WALL INSTALLATION Center right side wall on the 96 243 8 cm floor dimension Ensure the 1 2 5 cm wall panel overlap is to the bottom Install...

Page 24: ...cm D O O R Flush 2 5 1 cm Screw Fig B Fig A 2 5 1 cm Screw 3 3 Nail lower edge of wall panels to floor with 2 nails spaced 6 apart Angle nails into floor frame Fig C Nail back wall panel to side wall...

Page 25: ...m DOOR Flush Fig A 2 5 1 cm Screw 3 3 Nail lower edge of side wall panels to floor with 2 nails spaced 6 apart Angle nails into floor frame Fig C Nail back wall panel to side wall stud with 1 1 2 nail...

Page 26: ...Nail wall panels to side wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH 2 5 1 cm x12 1 1 2 3 8 cm x26 2 5 1 cm x4 PARTS REQUIRED Secure w...

Page 27: ...re shed means you will have a straight and professional looking roof ALL WALLS MUST BE LEVEL PLUMB SQUARE THE FINAL DIMENSIONS WILL BE EQUAL CORNER TO CORNER Determine which corner of your shed needs...

Page 28: ...1 BEGIN 2 Instal left and right front gable panels flush to center panel Secure parts with 1 1 2 nails evenly spaced You have finished assembling your front gable unit FINISH CKB CKB Flush Flush Flush...

Page 29: ...1 BEGIN 2 Instal left and right front gable panels flush to center panel Secure parts with 1 1 2 nails evenly spaced You have finished assembling your back gable unit FINISH BNC BNC Flush Flush Flush...

Page 30: ...d mark Fig A 3 7 6 cm Screws NAIL FIRST 2 5 1 cm 2 3 1 BEGIN Continue nailing lower edge of panels to gable nailer and top plate with 2 nails spaced 6 apart Working inside secure gable unit with 3 scr...

Page 31: ...sure and mark Fig A 3 7 6 cm Screws NAIL FIRST 2 5 1 cm 2 3 1 BEGIN Continue nailing lower edge of panels to top plate with 2 nails spaced 6 apart Working inside secure gable unit with 3 screws angled...

Page 32: ...1 4 screws spaced evenly FRONT GABLE TRIM FILLER PARTS REQUIRED DHB DHB 1 1 4 3 2 cm Screws Front gable wall shown FINISH Your front and back gable trim fillers are now installed Repeat steps to inst...

Page 33: ...ne edge of EEB Secure parts with 1 screws in pattern shown Install soffit unit flush to top of front and back gable fillers Install the 1 8 fascia overlap toward the bottom Secure 3 8 fascia to gable...

Page 34: ...he gable panel for position Fig A Secure 6 FYA with 3 1 2 screws FINISH Your roof purlins are now installed Repeat steps for securing purlins at both sides 3 1 2 8 9 cm x24 3 1 2 8 9 cm Screws CENTER...

Page 35: ...panel Fig A and flush to eave wall panel Fig B Secure with 2 finishing nails spaced evenly Install eave side 69 corner trim flush to eave soffit Fig A and flush along seam of installed corner trim Fi...

Page 36: ...h with top of gable filler Secure trim with 2 finishing nails spaced evenly as shown Your gable trim is now installed Repeat to install gable trim on opposite side Repeat to install trim panel on oppo...

Page 37: ...om edge in line with string Referencing the center line marks on top of the gable trim secure panel to soffit trim and purlins with 3 1 1 2 screws Install screws in panel valley Fig D nearest edge Fig...

Page 38: ...ves Fig D and flush to string Secure panel to trim EEB and roof joists FYA with 3 1 1 2 screws in panel valley nearest edge Install roof panel with 3 overlapping contour waves covering the prevoiusly...

Page 39: ...aves and overlap the final panel by 4 contour waves Install 4 screws in each panel valley nearest edge Install 8 screws in last panel as shown Flush edge to string 3 Panel Waves 3 Panel Waves 4 Panel...

Page 40: ...the lower 6 screws from metal panels and eave trim Fig E Beginning at the front panel tuck 5 foam enclosures in between roof panels and eave trim Reinstall screws METAL ROOF PANELS PARTS REQUIRED Clos...

Page 41: ...each panel O indicates 1 1 2 Screws screws already installed BEGIN 1 x24 x64 7 8 22 cm 1 1 2 3 8 cm 6th Valley 3rd Valley 6th Valley 3rd Valley FRONT 21 5 16 54 1 cm 69 5 16 176 1 cm 2 5 1 cm 45 5 16...

Page 42: ...BEGIN 1 Ridge Cap 4 x 4 x 54 10 2 x 10 2 x 137 2 cm x2 x12 7 8 2 2 cm Closure Strip 24 61 cm x10 Flush Flush Fig A Closure Strip Ridge Cap 7 8 2 2 cm Screw FINISH Your ridge cap are now installed Fig...

Page 43: ...E PARTS REQUIRED Measure and mark 72 182 9 cm mark on 1 drip edge strip Measure and mark 52 1 4 132 7 cm on 1 drip edge strip Using a framing square scribe a 28o line from your center point cut the li...

Page 44: ...peak of gable Position vertical edge of drip edge flush to gable trim Secure with 6 7 8 screws per side as shown FIg A Edge flush to trim 7 8 2 2 cm METAL DRIP EDGE continued PARTS REQUIRED Repeat ste...

Page 45: ...RS 2 3 Attach temporary support OO with 3 screws in middle and at ends as shown Attach temporary support GAA with 2 1 1 4 screws as shown OFFSET 3 8 1 cm 3 8 1 cm 3 8 1 cm OFFSET GREEN RED 3 7 6 cm x4...

Page 46: ...r doors are now installed Screw hinge boards into wall supports and floor using 10 3 screws as shown Make sure screws go into framing and floor Fig C D 6 Fig B SEAM Fig C 3 8 9 5 mm Fig D Angle 3 7 6...

Page 47: ...pening CENTER CENTER Fig B AH 11 1 4 28 6 cm You have finished securing your door and trim FINISH BEGIN 1 2 Secure 2 horizontal door rails AH with 4 3 4 screws from behind to center of doors as shown...

Page 48: ...rom inside edge of door Mark center of window opening on door Position window in opening flush to bottom of window opening Center window on mark Use 4 screws to secure each window 2 Apply high quality...

Page 49: ...D THESE DIMENSIONS BEGIN Center OO vertically on the left door in the doorway Fig A overlapping 1 2 5 cm along the edge of door Fig B Secure with 7 2 screws through outside trim into OO 1 Center OO ve...

Page 50: ...ith 1 4 drill 1 3 4 4 4 cm 1 4 Pre drill and 1 2 Drill through Fig A 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit 3 4 1 9 cm x12 Install decorative hinges on horizontal trim and flush against hinge 3 1 3 4...

Page 51: ...cting base Fig B Mark and pre drill holes for screws Install bolt with screws supplied Drill 5 16 7 9 mm hole deep enough for bolt to slide into Your spring bolts are now installed FINISH BEGIN 1 PART...

Page 52: ...cure with 1 1 2 screws 2 1 3 4 3 8 cm 35 3 4 90 cm RIGHT DOOR DOOR HARDWARE DECORATIVE HINGES x1 3 4 1 9 cm x12 x4 x2 PARTS REQUIRED 1 1 2 3 8 cm Re drill hole with 1 2 drill Keep drilled hole square...

Page 53: ...e panel Fig A Secure with 2 finishing nails spaced evenly Install 6 eave side 69 battens flush to eave soffit Fig A Measure and mark centers of battens from corner trim Middle batten covers the seam S...

Page 54: ...and back walls as shown 1 at top and 1 at bottom Cut out marked openings Caulk behind vent flanges Secure with 1 2 screws 1 Your vents are now installed FINISH 16 x 8 x2 1 2 13 mm x12 6 15 2 cm 3 5 7...

Page 55: ...7 1 4 X 48 RGT BCK K 48002704100 1 Back Wing Gable Panels 3 8 NG 27 1 4 X 48 LFT BCK K 48002704200 1 Front Back Corner Trim 3 8 NG 1 3 4 X 70 1 2 K 70080112000 6 Side Corner Trim Batten 3 8 NG 1 3 4 X...

Page 56: ...siding trim and OSB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solu...