22
GABLE WALL PANELS
PARTS REQUIRED:
2" (5,1 cm)
Nails
2
3/4" GAUGE
BLOCK
3/4"
Gauge
Block
6"
(15,2 cm)
12"
(30,5 cm)
Install (2)
48" x 76"
panels on frame flush at top. Use the gauge block
GAA
to maintain a 3/4" measurement on
the wall stud. Panels will overlap the frame approximately 3-1/2" (8,9 cm) at each side.
Secure panels with 2" nails spaced 6" apart along edges and 12" inside panel.
Install panels with the primed side facing up.
x90
2" (5,1 cm)
3/8 x 48 x 76"
(1 x 121,9 x 193 cm)
x2
FINISH
Repeat steps to build your second gable wall.
Your gable walls are now assembled.
Carefully flip the gable walls over.
3/4"
(1,9 cm)
For squareness maintain fush and
3/4" measurement along panel edge.
BEGIN HERE
Flush
Flush
Flush
GAA
3-1/2"
(8,9 cm)
3-1/2"
(8,9 cm)