26
RIGHT WALL
3" (7,6 cm)
2" (5,1 cm)
x18
x2
x22
1-1/2" (3,8 cm)
PARTS REQUIRED:
3" (7,6 cm)
x8
2" (5,1 cm)
x4
2
Your walls are now installed.
FINISH
Nail lower edge of panels to floor
with 2" nails spaced 6" apart.
Angle nails into floor frame
(Fig. C)
.
Secure 8' wall panels to 12' wall studs
with 1-1/2" nails spaced 6" apart.
Secure wall bottom plates to floor with 3" nails
.
Secure wall top plates with (1) 3" screw
at both corners, angled as shown
(Fig. D)
.
3
4
Place 8' gable wall on floor, centered between installed walls.
Secure wall with (1) 2" screw through the eave wall panel
into 8' wall bottom plate
(Fig. A)
and top plate
(Fig. B)
.
Secure wall to bottom plate first.
BEGIN
1
Flush
Flush
ENSURE PANEL CORNERS ARE FLUSH.
2"
(5,1 cm)
Screw
Fig. B
2"
(5,1 cm)
Screw
2"
(5,1 cm)
Screw
2"
(5,1 cm)
Screw
Fig. B
1-1/2"
(3,8 cm)
Nails
6"
(15,2 cm)
6"
(15,2 cm)
3"
(7,6 cm)
Nails
Fig. D
3" (7,6 cm)
Screw
2"
(5,1 cm)
Nails
2"
(5,1 cm)
Nails
3"
(7,6 cm)
Nails
Nail 2"
nails first.
Fig. C