35
x16
PARTS REQUIRED:
ROOF PANELS
2" (5 cm)
5
NOTE:
Measurements are to outside of rafter.
Fig. D
2" (5,1 cm)
Nails
Maintain spacing between the center of the rafters
(Fig. D)
.
Secure panels with (1) 2" nail into each rafter.
Move to the bottom of the panel and secure panels with (1) 2" nail into each rafter.
24"
(61 cm)
24"
(61 cm)
24"
(61 cm)
24"
(61 cm)
24"
(61 cm)
24"
(61 cm)
Install
48" x 96"
and
10-3/4" x 48"
roof panels flush to the installed panels.
Secure panel with (1) 2" nail in each corner.
6
2" (5,1 cm)
Nails
10-3/4
" x 4
8"
48" x 9
6"
Flush
Flush
Flush
Flush
7/16 x 10-3/4" x 48"
(1,1 x 27,3 x 121,9 cm)
x2
7/16 x 48 x 96"
(1,1 x 121,9 x 243,8 cm)
x2
DOOR