40
PARTS REQUIRED:
x20
Install
2-1/2" x 72-3/4"
fascia flush at center and flush with top of roof panels
(Fig. A)
.
Secure fascia to soffit 2 x 4 overhang with 2" finishing nails.
2-1/2" x 72-3/4"
2-1/2" x 72-3/4"
BEGIN
1
2" (5,1 cm)
FINISH
EAVE FASCIA
2" (5,1 cm)
Finishing
Nails
x4
3/8 x 2-1/2 x 72-3/4" (1,0 x 6,3 x 184,8 cm)
Flush
Flush
Your eave fascia is now installed.
Repeat steps for opposite side of shed.
Fig. A
Flush at center
Flush