34
Two Nails
x4
3
4
PARTS REQUIRED:
ROOF PANELS
2" (5 cm)
Install a
47-7/8" x 48"
roof panel flush to the installed panel,
flush at peak
(Fig. B)
and
with a 3/4" measurement
on the rafter
(Fig A)
.
Secure panel with (2) 2" nails in the corners.
DOOR
Flush at peak.
Fig. B
Move the gable until it is 3/8" from the roof panel
(Fig. C)
.
Flush the panel at the peak of the gable rafter
(Fig. B)
.
Secure panel with (2) 2" nails in the corners.
DOOR
47-7/8" x 48"
Flush
Move Gable
3/8"
(0,9 cm)
Gable
End Rafter
Fig. C
Flush at peak.
Fig. B
3/4"
(1,9 cm)
Fig. A
Gauge
Block
Two Nails