32
GABLE UNIT INSTALLATION
PARTS REQUIRED:
FINISH
Your gable units are now installed
Repeat steps to install the opposite side gable unit.
x4
3" (7,6 cm)
BEGIN
Place gable unit on front wall top plate.
It is important to secure the gable unit in the following order:
2
4
Continue nailing lower edge of panels into top plate with 2" nails spaced 6" apart.
Continue securing panels to rafter with 2" nails spaced 6" apart.
Working inside, secure gable unit with (2) 3" screws screwed into
ARC
at an angle as shown
(Fig. A)
.
3
Measure 1-1/2" down from top plate and mark at each side as shown. Set gable unit on top plate.
Hold secure with one 2" nail on each side.
1
BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.
ARC
NAIL FIRST
2" (5,1 cm)
NAIL FIRST
2" (5,1 cm)
TOP PLATE
1-1/2"
(3,8 cm )
Measure and
Mark
1-1/2"
(3,8 cm )
Measure and
Mark
6"
(15,2 cm)
Fig. A
3" (7,6 cm)
Screws
x2
Gable Units
2" (5,1 cm)
x36