37
GUA
GUA
NOTE:
2" nails from from back side of rafter
DOOR
PARTS REQUIRED:
x12
Secure collar tie to rafter with (3) 2" nails at each end.
FINISH
Your collar ties are now installed.
COLLAR TIES
Place and level collar ties
GUA
on
2nd rafter
(which is the rafter above center of the door)
and on back of
4th rafter
.
Ensure collar tie is level and flush to roof panels.
GUA
x2
1 x 3 x 60" (2,5 x 7,6 x 152,4 cm)
2" (5,1 cm)
BEGIN
1
Flush
Flush
2nd Rafter
4th Rafter
LEVEL
LEVEL