33
Roof panels may cause serious injury until securely fastened.
Note: Install all roof panels with the rough side up (painted grid lines).
PARTS REQUIRED:
x4
2" (5,1 cm)
3/4" GAUGE
BLOCK
7/16 x 10-3/4" x 96"
(1,1 x 27,3 x 243,8 cm)
x2
2
ROOF PANELS
BEGIN
1
Place an
10-3/4" x 96"
panel on rafters with a 3/4" measurement on the rafter
(Fig A)
and the panel flush at the rafter peak
(Fig. B)
.
Secure panel with (2) 2" nails in the corners.
DOOR
DOOR
Move to the opposite end.
Using the long edge of the panel as a lever,
move the panel side-to-side until the top corner
is flush to the peak
(Fig. B)
and there is a 3/8"
measurement to the gable end rafter
(Fig. C)
.
Move the gable unit if necessary.
Secure panel with (2) 2" nails in the corners.
3/8"
(0,9 cm)
Gable
End Rafter
Fig. C
Move Gable
7/16 x 47-7/8 x 48"
(1,1 x 121,6 x 121,9 cm)
x2
10-3/4" x 96"
Flush at peak.
Flush at peak.
Fig. B
Fig. B
Two Nails
Two Nails
3/4"
(1,9 cm)
Fig. A
Gauge
Block