PAGE 1 OF 12
0221 IH-1789
STOCK PICKER CARTS
1-800-295-5510
uline.com
Rubber Mallet
7/16" Wrench
TOOLS NEEDED
SHELVING ASSEMBLY
INSTALLATION OF CASTERS
Figure 2
03
04
05
06
07
08
09
Figure 1
1. Make sure post is positioned as shown. (See Figure 1)
1. Engage the wheel brakes to keep casters from rolling during
assembly. Use a rubber mallet to tap caster stems into posts.
(See Figure 1)
1. Start with the lowest shelf. Snap the interlocking pieces of a shelf
support (wide end down) around the post at the lowest groove where
shelf is to be located. (See Figure 2)
NOTE: Two ridges are on the inside of each shelf support. The
bottom shelf support ridge should be aligned with the lowest
groove on the post.
2. Slide the shelf support up or down until it snaps into the groove. Add
shelf supports to the same place on the remaining posts.
SHELVING PARTS
NOTE: Self-leveling feet are included
in post box. See Page 3 for installation.
NOTE: Shelf supports are included
in shelf box.
Self-Leveling Foot x 4
Metal Insert
Shelf x 4
Shelf Support x 16 Sets
Post x 4
Shelf Support
Caster x 4
Para Español, vea páginas 5-8.
Pour le français, consulter les pages 9-12.