background image

LIMITED CONDITIONAL WARRANTY*

Backyard Storage Solutions, LLC warrants the following:

1. 

Every product is warranted from defects in workmanship and manufacturing for 1 year.

2. 

All accessories, hardware and metal components are warranted for 2 years.

3. 

All Oriented Strand Board (OSB) is warranted for 2 years

4. 

Siding and Trim is warranted for 10 years.

5. 

Solar Shed windows are warranted for 1 year.

6. 

Cedar lumber is warranted for 15 years.

7. 

Preserved Pine is warranted for 10 years.

Backyard Storage Solutions, LLC will repair, replace or pay for the affected part.  In no event shall Backyard Storage Solutions, LLC 

pay the cost of labor or installation or any other costs related thereto.  All warranties are from date of purchase.  If a cash refund is paid 

on an affected part, it will be prorated from the date of purchase.

CONDITIONS

The warranty is effective only when:

1. 

The unit has been erected in accordance with the assembly instructions. 

2. 

The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter.

3. 

The failure occurs when the unit is owned by the original purchaser.

4. 

Backyard Storage Solutions, LLC has received the warranty registration card within thirty (30) days of purchase and

 

notification of the failure in writing within the warranty period specified above.

5. 

Backyard Storage Solutions, LLC has had reasonable opportunity during the sixty (60) days following receipt of notification to

 

inspect and verify the failure prior to commencement of any repair work.

REQUIREMENTS

Storage Buildings

To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or 

solid-colored stain the siding using quality, 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of 

assembly; caulk above all doors and all horizontal and vertical trim boards; paint and seal all exposed edges, sides and faces of 

siding/trim and OSB siding to include all exterior walls and all sides and all edges of doors.  

Gazebos & Pergolas

To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit.  This includes treating all of 

the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative, an exterior 

oil-based semi-transparent stain, an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly 

and as needed thereafter to maintain your warranty.

Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement.  

The minimum ground clearance for siding must be one half inch (½ inch) from concrete slab or two and one half inches (2 ½”) from the 

ground when building is erected or constructed on a treated wood floor kit. Water from sprinklers must be kept off unit. In no event will 

Backyard Storage Solutions, LLC be responsible for any indirect, incidental, consequential or special damages nor for failure(s) that 

are caused by events, acts or omissions beyond our control including, but not limited to, misuse or improper assembly, improper 

maintenance (which eventually leads to rot or decay) and acts of God. Backyard Storage Solutions, LLC will not be held responsible for 

any labor costs incurred to construct your unit.

This warranty gives you certain specific rights that vary from state to state.

CLAIM PROCEDURE

To make a claim under this warranty, you can either call 1-888-827-9056 or email: [email protected].  Please 

have ready the information below when you call or include the information in your email:

1. 

The model and size of the product.

2. 

A list of the part(s) for which the claim is made.

3. 

Proof of purchase of the Backyard Storage Solutions, LLC item, as shown on the original invoice.

4. 

Run code: found on exterior product label or assembly instructions enclosed in the product package.

All other inquiries can be mailed to:

 

Backyard Storage Solutions, LLC

 

Attn: Customer Service

 

1000 Ternes

 

Monroe, MI 48162

 *WARRANTY TERMS MAY VARY OUTSIDE THE U.S.A.

IMPORTANT:  This is your warranty certificate.

WARRANTY REGISTRATION

Please complete your warranty registration to properly validate your warranty.

Register your product online at:www.OnlineWarranty.net.

Summary of Contents for GABLE 10 x 8

Page 1: ...enjoy building your shed JOIN OUR TEAM AND MAKE UP TO 1 500 WEEK STOP Flexible schedule No selling just building Bonus incentives available INSTALLERS WANTED based on number of completed installation...

Page 2: ...C Puerto Rico 18 or older to participate Taxes on prize are responsibility of winner Odds of winning depend on the number of eligible reviews received Void where prohibited For complete details and of...

Page 3: ...restrictions and or requirements before building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper ass...

Page 4: ...finished the assembly or installation Level Gloves Clamps Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material lea...

Page 5: ...R INSTALLATION OF SHINGLES DRIP EDGE AND FELT 3 TAB SHINGLES 5 Bundles PAINT FOR SIDING 2 Gallons Use 100 acrylic latex exterior paint 2 coat recommended CAULK 2 Tubes Use acrylic latex exterior caulk...

Page 6: ...5 1 x 10 2 x 43 2 cm CHA 2 x 4 x 29 5 1 x 10 2 x 73 6 cm CBA 2 x 4 x 14 13 16 5 1 x 10 2 x 37 6 cm KV 19 32 x 2 1 2 x 8 1 5 x 6 4 x 20 3 cm UU 2 x 4 x 9 5 1 x 10 2 x 22 9 cm TP 2 x 4 x 96 5 1 x 10 2 x...

Page 7: ...16 x 23 7 8 x 48 1 1 x 60 6 x 121 9 cm 7 16 x 8 1 2 x 96 1 1 x 21 6 x 243 8 cm 7 16 x 8 1 2 x 23 7 8 1 1 x 21 6 x 60 6 cm x2 x2 x2 x2 x2 x2 x2 x1 3 8 x 23 7 8 x 72 1 x 60 6 x 182 9 cm x4 3 8 x 48 x 72...

Page 8: ...and board OSB 20 1 2 x 96 60 6 x 243 8 cm x1 48 x 96 121 9 x 243 8 cm x2 3 7 6 cm x2 BOXES x4 BOXES 2 5 1 cm FLOOR PANELS Not Included You will need flOOr panels to complete your floor Floor panel siz...

Page 9: ...tual size FASTENER HARDWARE BAG x1 x1 56 142 2 cm METAL THRESHOLD 3 7 6 cm 2 5 1 cm 1 1 4 3 2 cm 1 2 5 cm 3 4 1 9 cm Bagged separately special coating 3 4 1 9 cm x22 x63 x46 x10 x10 x76 2 5 1 cm x96 1...

Page 10: ...om edge of siding 5 Siding overhangs the wall framing and floor to keep the elements out 6 Collar tie maintains door frame integrity 7 Includes treated floor frame and sturdy Oriented Strand Board OSB...

Page 11: ...ding in water drainage use gravel under each concrete block LEVELING METHODS If you are building your shed on a concrete foundation see the following page CONCRETE MATERIAL REQUIRED x2 4 x 4 x 10 8 9...

Page 12: ...ll your kiton a concrete slab refer to the diagram below A treated 2 x 4 sill plate is required when installing your shed on concrete Hint Use treated lumber in your kit or purchase full length treate...

Page 13: ...measuring diagonally across corners If the measurements are the same the frame is square The diagonal measurement will be approximately 151 383 5 cm When the frame is level and square secure one side...

Page 14: ...and square frame Use 2 3 7 6 cm nails at each mark and 4 3 7 6 cm nails at seams as shown Arrange parts as shown on flat surface Measure and mark each dimension from end of boards FLOOR FRAME FLOOR F...

Page 15: ...rners Move to the opposite side Using the long edge of the panel as a lever move the panel side to side until corner is flush to the floor frame Fig B Secure panel with 2 2 5 1 cm nails in the corners...

Page 16: ...ue installing panels with rough side up painted grid lines Use a chalk line or grid lines on panel for 2 5 1 cm nails 6 15 2 cm apart on edges and 12 30 5 cm apart inside panels 5 7 6 x1 x1 5 8 x 48 x...

Page 17: ...ck the floor frame is level after installing floor panels Re level if needed The floor should be used as a level work surface for wall construction Organize your wall sections during sub assembly to a...

Page 18: ...as shown Build 2 identical side walls HINT For easier nailing stand on frame TP TP UM x5 96 243 8 cm 72 182 9 cm 48 121 9 cm 24 61 cm 68 172 7 cm 1 1 2 3 8 cm 1 1 2 3 8 cm TP x4 2 x 4 x 96 5 1 x 10 2...

Page 19: ...o wall frame as shown Use the gauge block to mark the 3 4 measurement on the wall stud Secure panel with 2 2 nails in the corners Fig A Complete securing the panel with 2 nails spaced 6 apart on edges...

Page 20: ...s are now assembled Repeat steps 2 5 to install panels on your 2nd side wall frame FINISH 2 5 1 cm Nails 2 5 1 cm Nails x45 2 5 1 cm 1 2 5 cm Install 2nd 48 x 72 panel flush to installed panel Secure...

Page 21: ...4 47 6 cm 24 61 cm 24 61 cm 24 61 cm 68 172 7 cm UM x4 CDA CFA CFA CDA BEGIN 1 Arrange parts on edge on floor Measure and mark Secure parts with 2 3 nails at each mark and 4 3 nails at seams CFA x2 2...

Page 22: ...ced 6 apart on edges and 12 apart inside panel Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure...

Page 23: ...part Carefully flip your back wall over Install 2nd 46 1 8 x 72 panel flush to installed panel Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel 7 Your back wall is now assembled F...

Page 24: ...s with 2 3 nails at each mark and 4 3 nails at seams Maintain dimensions between studs Maintain dimensions between studs 56 142 2 cm 17 43 2 cm 9 22 9 cm 10 1 2 26 7 cm PARTS REQUIRED CGA x1 2 x 4 x 8...

Page 25: ...2 nails spaced 6 apart on edges and 12 apart inside panel 3 8 x 48 x 72 1 x 121 9 x 182 9 cm 2 3 Install OO as temporary brace to maintain 56 142 2 cm dimension Secure with 2 3 screws Flip front wall...

Page 26: ...again with panels facing up Secure panel to window framing with 2 nails spaced 6 apart Your front wall is now assembled Proceed to standing your walls PARTS REQUIRED FRONT WALL FINISH x8 3 7 6 cm CCA...

Page 27: ...th 2 nails spaced 6 apart Angle nails into floor frame Fig A 2 3 4 Your back and front walls are now standing Repeat steps to install your front wall FINISH Center back wall assembly on the 116 1 2 29...

Page 28: ...sure the measurement between the panel edges are the same along the corner Secure with 1 1 1 2 nail in the upper corner Fig B Secure front and back panels to side wall studs with 2 nails spaced 6 apar...

Page 29: ...e of front and back top plates Fig A and flush to wall panels Fig B Secure with 2 3 nails spaced 24 apart and with 4 nails at seams as shown 24 61 cm apart 21 1 4 54 cm 96 243 8 cm 96 243 8 cm 21 1 4...

Page 30: ...additional rafter assemblies Remove CBA 3 4 5 2 Center 1 4 0 6 cm gap Gusset CBA Flush 2 5 1 cm Nails Place 2 rafter halves NPE in the corner of back and side wall and CBA Ensure rafters are flush at...

Page 31: ...2 3 screws at each connection Fig A Drive screw through top plate into doubler Fig B 1 2 FINISH Your rafters are now installed 3 7 6 cm PARTS REQUIRED BEGIN RAFTER INSTALLATION 2 3 7 6 cm Screws Fig...

Page 32: ...enter of gable panel Secure center gable panel to 2 CBA with 1 1 2 nails Install left and right gable panels flush to center gable panel Secure with 1 1 2 nails spaced evenly Repeat steps to build 2nd...

Page 33: ...onnectors CBA are sitting flush on top of frame Panels should be flush to doublers as shown Fig A B Secure panel to top plate with 2 nails spaced 6 apart Working inside secure gable connectors to top...

Page 34: ...e trim MCB flush along top of panel and with end flush to center mark Fig A Secure trim to gable unit panels with 1 1 4 screws spaced 6 apart Screw through panels into gable trim Repeat step 1 to inst...

Page 35: ...55 9 cm PT Place parts flush to bottom of doubler as shown Fig A Secure with 2 finish nails spaced 24 apart BEGIN 1 FINISH Your fascia trim is now installed Repeat process on opposite side PRD PRD PT...

Page 36: ...serious injury until securely fastened Install all roof panels with the rough side facing up painted grid lines side 1 BEGIN Install 1 48 x 96 panel Use the gauge block to ensure the 3 4 measurement...

Page 37: ...he 9 16 measurement at the gable Fig F Fig G Move the gable if necessary Install 2 lower roof panels flush to the upper panels Ensure the 23 7 8 x 48 panel is at the 9 16 measurement along the gable t...

Page 38: ...3 x 96 1 6 x 7 6 x 244 cm FINISH Install 3 x 96 support flush with bottom edge of top plate and side wall frame Secure with 2 nails as shown Your door frame support is now installed BEGIN 1 DOOR OPEN...

Page 39: ...4 3 2 cm Screws PARTS REQUIRED x1 x1 Left Door Right Door DOORS 3 7 6 cm x4 1 x 3 x 5 2 5 x 7 6 x 12 7 cm x1 GAA x2 1 1 4 3 2 cm Place doors on flat surface 3 8 offset is to top Look for red right and...

Page 40: ...a ledger board flush under wall panels for doors to rest on with 2 3 screws Fig A Screw hinge boards into top plate and floor with 3 screws Screw hinge boards into studs with 2 screws as shown Remove...

Page 41: ...anel into trim Fig A Locate screws as shown in Fig B Use 2 screws at seams Center metal threshold between doors and secure with 10 3 4 special coating screws into floor as shown Fig C 3 PARTS REQUIRED...

Page 42: ...2 door weatherstrips are now installed With left door closed center a weatherstrip OO vertically on the left door in the door opening Fig A OO will offset the left door 1 2 5 cm OUT past the door tri...

Page 43: ...ews Install bolt with screws supplied and drill 5 16 0 8 cm hole deep enough for bolt to slide into LEFT DOOR 5 16 0 8 cm Drill Bit PARTS REQUIRED DOOR HARDWARE 2 3 4 BEGIN 1 x2 x8 1 2 5 cm HINT With...

Page 44: ...6 cm 1 2 1 3 cm Drill Bits x1 x2 FINISH 2 3 Measure and mark location of hole on outside of right door as shown Pre drill pilot hole with 1 4 dril Pre drill through hole with 1 2 drill Drill hole squa...

Page 45: ...ar ties away from view from door back side of rafters FINISH Your collar ties are now installed COLLAR TIES BEGIN 1 Install 2 collar ties JF on the two center rafters above the door Ensure collar ties...

Page 46: ...gable panel cutouts Fig A Secure with 2 finish nails 10 25 4 cm apart BEGIN 1 FINISH Your corner trim is now installed Repeat on each corner of shed CORNER TRIM x8 3 8 x 1 3 4 x 72 1 x 4 4 x 182 9 cm...

Page 47: ...ters are now assembled Proceed to install your window Install with primed side facing down 19 32 x 2 1 2 x 22 1 2 1 5 x 6 4 x 63 5 cm 19 32 x 2 1 2 x 8 1 5 x 6 4 x 20 cm x6 x4 FF KV KV x2 FF x3 Flush...

Page 48: ...4 3 2 cm PARTS REQUIRED BEGIN 1 Seal window with high quality exterior grade caulk 2 3 Install and secure window with 4 1 1 4 screws as shown Mark center of window frame x4 HINT Caulk behind frame nea...

Page 49: ...1 2 finish nail at dot Nail into wall frame inside Working from INSIDE of the shed secure the shutter to wall panel with 3 3 screws indicated at X Repeat steps 4 5 to install shutter on opposite side...

Page 50: ...must be painted Bottom edge of all siding and trim Inside of doors and all 4 edges Paint under door trim to match shed color Note Prime all un primed exterior wood before painting Follow directions p...

Page 51: ...rter row must be straight and level all the way across with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decki...

Page 52: ...ush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flu...

Page 53: ...ge cut to peak with a utility knife Repeat steps 1 6 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge...

Page 54: ...se cut off pieces first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 BEGIN 1 2 5 1 cm 2 5 1 cm 2 5 1 cm...

Page 55: ...m between the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge...

Page 56: ...22 5 J 24000600225 8 Front Wall Panel A 3 8 NG 12 1 2 X 72 K 72001208000 1 Front Wall Panel B Window opening 3 8 NG 48 X 72 FRONTWALL W K 72004800310 1 Back Wall Panel A 3 8 NG 46 1 8 x 72 PANEL K 72...

Page 57: ...ebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo o...

Reviews: