31
Repeat steps to install opposite side gable unit
GABLE UNIT INSTALLATION
2
FINISH
Your gable units are now installed.
1
BEGIN
Center gable assembly on side wall with mark.
Ensure gable connectors
CBA
are sitting flush on top of frame.
Panels should be flush to doublers, as shown
(Fig. A, B)
.
Secure panel to top plate with 2" nails spaced 6" apart.
Working inside, secure gable connectors to top plate with (2) 3" screws at an angle.
PARTS REQUIRED:
x42
2" (5,1 cm)
x8
3" (7,6 cm)
6"
(15,2 cm)
2" (5,1 cm)
Nails
Flush
Flush
Flush
Flush
Align Center Mark
with seam
3" (7,6 cm)
Screws
CBA
CBA
Fig. A
Fig. B