3
12"
(30,5 cm)
• This shed kit includes a wood floor frame, it does not include floor panels.
• This shed does not include any leveling materials.
•
See the FLOOR LEVELING section on page 9 for recommended methods and suggested materials to properly level your
floor, as this will vary depending on your specific site.
COMPLETING YOUR SHED
You will need these additional materials:
OPTIONAL MATERIALS
FOUNDATION OR FLOOR MATERIALS
ADDITIONAL MATERIALS
DRIP EDGE ..................... 40 Feet
#15 ROOFING FELT
To cover 100 Sq. Ft. of roof area.
1" GALVANIZED ROOFING NAILS.........1/4 Lb
For roofing felt.
REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER’S INSTRUCTIONS FOR
INSTALLATION OF SHINGLES, DRIP EDGE AND FELT.
3-TAB SHINGLES ...........................................5 Bundles
PAINT FOR SIDING ........................................2 Gallons
Use 100% acrylic latex exterior paint. (2) coat recommended.
CAULK ............................................................2 Tubes
Use acrylic latex exterior caulk that is paintable.
1" GALVANIZED ROOFING NAILS.... 2 Lbs
For shingles.
PAINT FOR TRIM .............................1 Quart
Use 100% acrylic latex exterior paint.
IMPORTANT! The included floor has been designed for general use. Depending on your specific use you may want to
construct a heavy duty floor frame by adding additional floor joists (shown below as shaded). Below is a list of additional
materials (not included).
x5
x20
2 x 4 x 8' (5,1 x 10,2 x 243,8 cm) Treated Lum-
ber
Cut lumber to 2 x 4 x 93" (5,1 x 10,2 x 236,2 cm)
Treated Lumber
ea. 3" (7,6 cm) hot-dipped galvanized nails
Optional 12" (30,5 cm) spacing
Standard 24" (61 cm) spacing
REINFORCED WOOD FLOOR FRAME (OPTIONAL)