![background image](http://html1.mh-extra.com/html/backyard-products/gable-10-x-8/gable-10-x-8_assembly-manual_3346872028.webp)
26
PARTS REQUIRED:
SIDE WALLS INSTALLATION
3" (7,6 cm)
Screw
Left Wall
6"
(15,2 cm)
6"
(15,2 cm)
1-1/2" (3,8 cm)
i
Nail
i
1-1/2" (3,8 cm)
i
Nail
i
FINISH
Secure the side wall top plate to the back and front wall top plates with (2) 3" screws at an angle
(Fig C)
.
Secure bottom plate to
floor
with (2) 3" nails between wall studs.
Secure the lower side wall corner to the back wall stud with (1) 1-1/2" nail
(Fig A)
.
Center right side wall on floor.
Ensure the measurement between the panel edges are the same along the corner.
Secure with (1) 1-1/2" nail in the upper corner
(Fig B)
.
Secure front and back panels to side wall studs with 2" nails spaced 6" apart.
Secure bottom of panel to floor frame with 2" nails spaced 6" apart. Angle nails into floor
frame
(Fig A)
.
You have finished standing your (2) side walls
Remove temporary parts.
2
3
4
1-1/2" (3,8 cm)
Nails
PARTS REQUIRED:
x4
x16
x32
x56
2" (5,1 cm)
1-1/2" (3,8 cm)
3" (7,6 cm)
3" (7,6 cm)
Fig. B
Fig. C
Fig. A
Same
Measurement
2" (5,1 cm)
i
Nail
i
1
BEGIN
Repeat steps to install your left side wall.
3" (7,6 cm)
Nails x8
(in bottom plate).
Right Wall