34
ROOF PANELS
PARTS REQUIRED:
x4
2" (5,1 cm)
2
3/4" GAUGE
BLOCK
Fig. C
Two
Nails
Two
Nails
3/4"
(19 mm)
Flush
at peak
Flush
at peak
Fig. A
9/16"
(1,4 cm)
1-1/2"
(3,8 cm)
Gable
Trim
Fig. D
Gauge
Block
7/16 x 48 x 96”
(1,1 x 121,9 x 243,8 cm)
7/16 x 23-7/8 x 48”
(1,1 x 60,6 x 121,9 cm)
7/16 x 8-1/2 x 96”
(1,1 x 21,6 x 243,8 cm)
7/16 x 8-1/2x 23-7/8”
(1,1 x 21,6 x 60,6 cm)
x2
x 2
x1
x 2
Roof panels may cause serious injury until securely fastened.
Install all roof panels with the rough side facing up (painted grid lines side).
1
BEGIN
Install (1)
48" x 96"
panel.
Use the gauge block to ensure the
3/4" measurement on the rafter
(Fig. A)
, and that the panel is flush
at the peak
(Fig. B)
.
Secure the panel with (2) 2" nails
in the corners.
Move to the opposite end.
Using the long edge of the panel as
a lever, move the panel side-to-side
until the top corner is flush at the
peak
(Fig. C)
.
Move the gable trim until it is 9/16"
from the roof panel
(Fig. D)
.
Secure panel with (2) 2" nails
in the corners.
Move Gable
Fig. B