![background image](http://html1.mh-extra.com/html/backyard-products/gable-10-x-8/gable-10-x-8_assembly-manual_3346872040.webp)
38
OO
Flush
against wall panels.
Fig. A
OO
PARTS REQUIRED:
x6
x6
3" (7,6 cm)
2" (5,1 cm)
DOORS
Fig. D
Fig. C
Fig. E
3" (7,6 cm)
Screw (angled).
3/8"
(1 cm)
2
Measure and mark center of door opening. Center doors on mark as shown
(Fig B)
.
3
4
5
Check hinge boards are flush under overhang
(Fig C)
.
FINISH
Your doors are now installed.
Attach temporary support
OO
as a ledger board flush under wall panels for
doors to rest on, with (2) 3" screws
(Fig. A)
.
Screw hinge boards into top plate and floor with 3" screws.
Screw hinge boards into studs with 2" screws, as shown.
Remove temporary supports and ledger board. Ensure the doors open properly.
Make sure screws go into framing and floor
(Fig. D, Fig. E)
.
3" (7,6 cm)
Screws into the
top plate and
floor frame.
2" (5,1 cm)
Screws into
hinge board
and stud.
x1
Center 3/8" measurement
on mark.
OO
56"
(142,2 cm)
28"
(71,1 cm)
Center
69" (175,3) Door Stiffener
Temporary Support
Flush
Fig. B