48
• Install felt flush to all roof edges overlapping 3". Use minimal amount of roofing nails to hold in place.
OK to overlap at ridge.
3" (7,6 cm)
OVERLAP
Flush
Flush
PARTS REQUIRED:
• Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim
and walls, and all around the door trim.
• Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas
that can be easily overlooked that must be painted:
• Bottom edge of all siding and trim
• Inside of doors and all 4 edges
• Paint under door trim to match shed color.
Note:
Prime all un-primed exterior wood before painting.
(Follow directions provided by manufacturer.)
PAINT & CAULK
- NOT INCLUDED -
ROOF FELT
- NOT INCLUDED -
DRIP EDGE
- NOT INCLUDED -
Snip bottom side of drip edge and
bend over to other side of roof.
(Follow directions provided by
manufacturer.)
• Install drip edge over roof felt on gable side and
under roof felt on eave side
(Fig. A)
.
• Do not use nails on side of drip edge that hangs over side of building.
• Only nail top of drip edge as shown.
Edge flush
to trim.
Fig. A
Drip
edge
Roof
felt
Drip edge