15
Side wall
Side wall
Front wall
Back Wall
Check the floor frame is level after installing floor panels. Re-level if needed.
• The floor should be used as a level work surface for wall construction.
• Organize your wall sections during sub-assembly
to avoid over-handling of the walls.
HINT:
IMPORTANT!