- 60 -
(2)Indoor unite and outdoor unit of 18000BTU~24000BTU
Attention: Turn off the air-conditioner and pull out the plug of the power supply before
the service.
1. Indoor unit:
No. Part
Operation
Process
Remark
1
Front
panel
1) Turn off the air-conditioner and cut
off the power supply;
2) Remove the adhesive tape sticking
to the panel.
3) Hold the handles at both sides of the
panel and push upward to have it slip
out;
4) Grasp the both sides of the panel
and push upward;
5) Turn the upper board by 90°and
unload it from the connecting pole
carefully;
6) Take out the filter from the right and
left side.
7) Screw off the bolts on the electrical
box cover and unload the box cover;
8) Screw off the six bolts on the
medium frame;
9) Hold the both sides of the medium
frame and open it gently;
10) Turn up the medium frame by about
90°;
11)
Offload the medium frame once
hearing the crack sound;
2
Water
draining
tank
1) Do No.”1” and “2” firstly, offload the
water draining soft tube;
2) Offload the water draining tank from
the chassis and take out the electrical
components.
Summary of Contents for ASW-H09A4/EAR1-dw
Page 1: ...For model ASW H09A4 EAR1 dw ASW H12B4 EAR1 dw ASW H18B4 EAR1 dw ASW H24B4 EAR1 dw ...
Page 6: ... 4 Remote Controller Instructions ...
Page 7: ... 5 ...
Page 8: ... 6 ...
Page 9: ... 7 ...
Page 10: ... 8 ...
Page 11: ... 9 ...
Page 12: ... 10 ...
Page 13: ... 11 ...
Page 14: ... 12 ...
Page 48: ... 46 ...
Page 68: ... 68 Exploded Pictures 1 Indoor unit exploded picture 7K 9K 12K BTU E Series ...
Page 70: ... 70 2 Outdoor unit exploded picture 7K 9K 12K BTU E Series ...
Page 72: ... 72 3 Indoor unit exploded picture 18K 24K BTU E Series ...
Page 74: ... 74 4 Outdoor unit exploded picture 18K 24K BTU E Series ...
Page 76: ......