- 8 -
L.P. Gas Installation Code, CSA-B149.2 as applicable;
The installation of electrical wiring from the electricmeter, main control
box or service outlet to the electrical appliance. Qualified installation
personnel must be familiar with all precautions required and have complied
with all requirements of state and local authorities having
jurisdiction. See:
National Electrical Code, ANSI/NFPA70.
The appliance individual shutoff valve must be disconnected from
the gas supply piping system during any pressure testing of that system
at test pressures in excess of 1/2psi (3.45kPa).
For an oven equipped with casters, the installation shall be made with a
connector that complies with the Standard for Connectors for Movable Gas
Appliances, ANSI Z21.69/CSA 6.16 and a quick-disconnect device that complies
with the Standard for Quick-Disconnect Devices for Use with Gas Fuel, ANSI
Z21.4/CSA6.9.When installing the oven with casters and quick-disconnect hose,
adequate means must be provided to limit the movement of the oven without
depending on the connector and the quick disconnect device or its associated
piping to limit the oven movement. Restraining means may be attached to the
vertical portion of the base frame in the rear of the oven.
Unpacking and Installation
Please dispose of all packaging materials and residues after unpacking;
Check the equipment. If it is damaged, please keep wrappers and
receipts which must be signed by the carrier representative (Driver), and
contact the carriers to pursue a claim within 15 days after receiving;
Be sure to install supporting legs before using, and do not tear up any
label or logo before normal using;
Please read these instructions carefully before installation and operation.
Summary of Contents for ATCO-513B-1
Page 7: ... 5 4 2 ATCO 513B Double Stacked Ovens ...
Page 8: ... 6 ...
Page 13: ... 11 ...
Page 31: ... 29 10 ELECTRICAL SCHEMATIC ...
Page 32: ... 30 ...
Page 33: ... 31 ...