![ATON RA.Store-3 Installation Manual Download Page 24](http://html1.mh-extra.com/html/aton/ra-store-3/ra-store-3_installation-manual_3004692024.webp)
24
Picture 17 – Terminal box QG-M1: Connections GRID and EPS lines
Inform the customer that the electricity supply is now available in the house.
Reconnect the electrical supply line of the house.
GRID LINE
ENTRY
EPS LINE ENTRY
(CONNECT ONLY IF
THE EXTERNAL
COMMUTATION
PANEL GRID / EPS IS
AVAILABLE)