![ATON RA.Store-3 Installation Manual Download Page 14](http://html1.mh-extra.com/html/aton/ra-store-3/ra-store-3_installation-manual_3004692014.webp)
14
Before starting the works on the battery modules and disconnect any cables, put on “OFF” the magnetothermal
breaker and the red button “0-1” available on the module of the Battery Management System (Picture 5 green
circle).
Picture 5 – Wiring of the battery modules and BMS
ATTENTION
The handling of each battery must be executed by two people.
For each battery and for the BMS module:
-
unscrew the 4 screws that keep it together with the chassis and the screw for the equipotential bond;
-
remove the battery from its slot by using the frontal handles;
-
remove completely the battery from its slot and put it on the floor
3.3.2.3
Application of auxiliary handles on the basic structure
Fix to the structure the special handles and reinforcement plates provided in the 4 points indicated in the
following images (Picturere 5A, Picturere 6, Picturere 7). Screw the handles over the entire length of the thread.
To move the structure manually it is necessary to correctly apply all 4 handles complete with the 2 plates
supplied.
Picture 5A – yellow handles
OFF