![ATON RA.Store-3 Installation Manual Download Page 10](http://html1.mh-extra.com/html/aton/ra-store-3/ra-store-3_installation-manual_3004692010.webp)
10
3
Installation
3.1
Procedure of installation
The procedure of installation is composed of four parts:
1.
Placement of the machine
2.
Wiring
3.
Commissioning with functional test
4.
Insertion of the installation data with check of data communication
The insertion part of the installation data is described in details in the specific manual “Site – Manual for the
registration on the portal" and can be done before the installation and commissioning phases, having previous
knowledge of the serial number of the machine.
Then check only the data communication towards ATON server: it is possible only after having finished the
installation, with the storage system in function.
ATTENTION
Install the system
-
in a room that must be: dry, covered with a roof, not floodable, not potentially explosive,
without any rodents and inflammable materials nearby,
-
sheltered from the direct rays of the sun,
-
at a distance of 10 cm at least from the walls of the building in order to maintain a
correct ventilation,
-
on a surface capable to bear its weight.
3.2
Placement of the machine
The storage system must be placed and installed at a minimum distance of 10 cm from any wall or surface in
order to allow the right ventilation and heat dissipation (see Picture 1).
Picture 1 – Minimum compulsory distances: 10 cm on each side