SAFETY AND MAINTENANCE MANUAL
1NO0055UK-00
PIAF 10
E
41
5.1. VERIFICATION DURING COMMISSIONNING
- Conformity to the decree from March 1
st
2004.
- New machine, this verification is done by
Atn
(following the standards in force).
- This 1st check is valid for 6 months.
5.2. PERIODIC VERIFICATIONS IN FRANCE
- Conformity to the decree from March 1
st
2004.
- The machine must be controlled every 6 months by an accredited body.
- This verification consist of:
- check of its state of condition.
- Operation tests:
* brakes.
* Devices controlling the lowering of the platform.
* all the emergency and safety devices (tilt, overload…)
5.3. ADEQUATION
Never forget to check, before using the machine, that it is adapted to the worksite and the job to
be accomplished. This must be done by the operator or his manager.
Summary of Contents for PIAF 10E 2018
Page 2: ...SAFETY AND MAINTENANCE MANUAL 1NO0055UK 00 PIAF 10E 2 DISTRIBUTOR STAMP...
Page 8: ...SAFETY AND MAINTENANCE MANUAL 1NO0055UK 00 PIAF 10E 8...
Page 10: ...SAFETY AND MAINTENANCE MANUAL 1NO0055UK 00 PIAF 10E 10...
Page 13: ...SAFETY AND MAINTENANCE MANUAL 1NO0055UK 00 PIAF 10E 13 Chapter I OPERATION AND SAFETY...
Page 14: ...SAFETY AND MAINTENANCE MANUAL 1NO0055UK 00 PIAF 10E 14...
Page 18: ...SAFETY AND MAINTENANCE MANUAL 1NO0055UK 00 PIAF 10E 18...
Page 24: ...SAFETY AND MAINTENANCE MANUAL 1NO0055UK 00 PIAF 10E 24...
Page 42: ...SAFETY AND MAINTENANCE MANUAL 1NO0055UK 00 PIAF 10E 42...
Page 43: ...SAFETY AND MAINTENANCE MANUAL 1NO0055UK 00 PIAF 10E 43 Chapter II MAINTENANCE...
Page 44: ...SAFETY AND MAINTENANCE MANUAL 1NO0055UK 00 PIAF 10E 44...
Page 66: ...SAFETY AND MAINTENANCE MANUAL 1NO0055UK 00 PIAF 10E 66 2 3 HYDRAULIC SCHEMATIC...
Page 78: ...SAFETY AND MAINTENANCE MANUAL 1NO0055UK 00 PIAF 10E 78 3 10 ELECTRIC SCHEMATIC...
Page 79: ...SAFETY AND MAINTENANCE MANUAL 1NO0055UK 00 PIAF 10E 79...
Page 80: ...SAFETY AND MAINTENANCE MANUAL 1NO0055UK 00 PIAF 10E 80 NOTES...
Page 81: ...SAFETY AND MAINTENANCE MANUAL 1NO0055UK 00 PIAF 10E 81 NOTES...