Dryer on/off switch
Step
Action
1
On Full-Feature units: move switch (3) of the dryer to position 0.
GX 2 EP to GX 5 EP:
•
Move start/stop switch (S) to position 0.
•
Turn off main switch (1)
GX 7 EP:
•
Move selector switch (S) to unload position.
•
Wait at least 30 seconds and turn off mains switch (1)
2
Close air outlet valve (2) and switch off the voltage to the compressor.
On Full-Feature units: switch off the voltage to the dryer.
3
Open condensate drain valve (4) of the air receiver for a few seconds to drain any
condensate and then close the valve.
The air dryer and the air receiver remain under pressure.
The integrated filter (if installed) remains pressurised.
If maintenance or repair work is necessary, consult the
Problem solving
section for all
relevant safety precautions.
4.4
Taking out of operation
Air outlet valve
Instruction book
46
2920 7105 31
Summary of Contents for GX 2 EP
Page 2: ......
Page 13: ...2 2 Air flow Pack Air flow floor mounted Pack units Instruction book 2920 7105 31 11 ...
Page 16: ...2 3 Oil system GX Pack Instruction book 14 2920 7105 31 ...
Page 18: ...2 4 Cooling system Pack units Instruction book 16 2920 7105 31 ...
Page 27: ...GX 7 EP IEC units with Y D start Instruction book 2920 7105 31 25 ...
Page 28: ...GX 7 EP for 208 230 460V 60 Hz DOL Instruction book 26 2920 7105 31 ...
Page 37: ...GX 7 EP Pack on 200l receiver 2 Cooling air inlet Instruction book 2920 7105 31 35 ...
Page 74: ......
Page 75: ......