Oil filler plug
This procedure should be carried out at the end of the compressor’s service life.
Step
Action
1
Stop the compressor and close the air outlet valve (2).
2
Switch off the voltage and disconnect the compressor from the mains.
3
Depressurise the compressor by opening plug (3) one turn.
Open condensate drain valve (4) of the air receiver.
4
Shut off and depressurise the part of the air net which is connected to the outlet valve.
Disconnect the compressor from the air net.
5
Drain the oil and condensate circuits.
6
Disconnect the compressor condensate outlet and valve from the condensate net.
Instruction book
2920 7105 31
47
Summary of Contents for GX 2 EP
Page 2: ......
Page 13: ...2 2 Air flow Pack Air flow floor mounted Pack units Instruction book 2920 7105 31 11 ...
Page 16: ...2 3 Oil system GX Pack Instruction book 14 2920 7105 31 ...
Page 18: ...2 4 Cooling system Pack units Instruction book 16 2920 7105 31 ...
Page 27: ...GX 7 EP IEC units with Y D start Instruction book 2920 7105 31 25 ...
Page 28: ...GX 7 EP for 208 230 460V 60 Hz DOL Instruction book 26 2920 7105 31 ...
Page 37: ...GX 7 EP Pack on 200l receiver 2 Cooling air inlet Instruction book 2920 7105 31 35 ...
Page 74: ......
Page 75: ......