Step
Action
1
Check that all bodywork panels are fitted.
Check that sheet (5) (explaining the procedure for checking the motor rotation direction)
is affixed to the cooling air outlet of the compressor (grating on the compressor top).
Consult
Dimension drawings
.
Switch on the voltage. Start the compressor and stop it immediately.
Check the rotation direction of the motor. If the motor rotation direction is correct, the label
on the top grating will be blown upwards. If the sheet remains in place, the rotation direction
is incorrect.
If the rotation direction is incorrect, switch off the voltage, open the isolating switch and
reverse two incoming electric lines.
All electrical work should be carried out by professionally qualified people.
2
Start and run the compressor for a few minutes. Check that the compressor operates
normally.
4.2
Starting
Air outlet valve
Condensate drain valve on air receiver
Instruction book
42
2920 7105 31
Summary of Contents for GX 2 EP
Page 2: ......
Page 13: ...2 2 Air flow Pack Air flow floor mounted Pack units Instruction book 2920 7105 31 11 ...
Page 16: ...2 3 Oil system GX Pack Instruction book 14 2920 7105 31 ...
Page 18: ...2 4 Cooling system Pack units Instruction book 16 2920 7105 31 ...
Page 27: ...GX 7 EP IEC units with Y D start Instruction book 2920 7105 31 25 ...
Page 28: ...GX 7 EP for 208 230 460V 60 Hz DOL Instruction book 26 2920 7105 31 ...
Page 37: ...GX 7 EP Pack on 200l receiver 2 Cooling air inlet Instruction book 2920 7105 31 35 ...
Page 74: ......
Page 75: ......