
139
6.2.18
Checking the seal of the cylinder balancing valves
Warning: this operation must be performed only by qualified technicians trained
by Almac Srl
With the frequency indicated in the general chart (as for the Proactive levelling
safety valves), check the seal of the flanged valves on the cylinders.
To perform this check, it is necessary to:
1)
Position the machine as indicated in the figure (chassis completely raised
and platform extended)
2)
Place 300Kg as shown in the figure
3)
Perform the procedure with the remote controller (running time 90
minutes)
4)
Make sure that the machine remains in the position where it was left and
that there were no movements due to oil leaking from the valves
(because of a malfunction or impurities trapped in the cursor).
5)
If the test has a positive outcome, position the machine as indicated in
the figure (chassis completely raised and platform retracted)
6)
Place 300Kg as shown in the figure
Summary of Contents for 1090 EVO
Page 7: ...7...
Page 22: ...22...
Page 23: ...23...
Page 49: ...49 37 Combustion engine 38 Fuel tank 39 Bi levelling chassis 37 38...
Page 78: ...78...
Page 80: ...80...
Page 122: ...122 In this configuration the oil level must be as shown in the figure below A 60mm...
Page 144: ...144...
Page 145: ...145...
Page 146: ...146...
Page 147: ...147...
Page 148: ...148...
Page 149: ...149...
Page 150: ...150...
Page 151: ...151...
Page 152: ...152...
Page 161: ...161 8 ATTACHMENTS 8 1 Declaration of conformity...
Page 163: ...163 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 177: ...177 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...