
101
Operating principle:
During travel at a height if an inclination of 0.5° is exceeded, light 1 will start to
flash; if 1° is exceeded, travel will stop.
•
It is necessary to release the joysticks
•
When the joysticks are reactivated, the platform will be levelled again.
The levelling can be performed also by commanding the upward
movement of the work platform.
Warning: If the levelling is performed by means of the joysticks, once the
levelling has been completed, the machine will start to travel
automatically in the selected direction!
When the machine is stopped if the platform is inclined by an angle between
0.5° and 1°, the system will level the platform:
•
By operating the work platform up control
In the case of an exceptional event (ground subsidence, falling from a step,
etc.) and the inclination of the frame is greater than 3°, all movements will be
blocked, both by the main system and by the additional safety system.
•
Light 1 will turn on
•
It is possible to control the "work platform descent" only until the
platform has been completely lowered
If the platform is higher than the transport height and the inclination of the
machine compared to the ground is greater than the value allowed, the travel
and lifting controls will be automatically inhibited
The table below lists the maximum permitted configurations previously
described.
Summary of Contents for 1090 EVO
Page 7: ...7...
Page 22: ...22...
Page 23: ...23...
Page 49: ...49 37 Combustion engine 38 Fuel tank 39 Bi levelling chassis 37 38...
Page 78: ...78...
Page 80: ...80...
Page 122: ...122 In this configuration the oil level must be as shown in the figure below A 60mm...
Page 144: ...144...
Page 145: ...145...
Page 146: ...146...
Page 147: ...147...
Page 148: ...148...
Page 149: ...149...
Page 150: ...150...
Page 151: ...151...
Page 152: ...152...
Page 161: ...161 8 ATTACHMENTS 8 1 Declaration of conformity...
Page 163: ...163 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 177: ...177 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...