QSG_F670_363.00_EN_01_2021-02-09
8/42
PRINCIPLE OF A CYCLE
The measurement cycle is made of 4 main phases: fill, stabilization, test, dumping.
A Pressure auto zero additional phase
0
can be placed at the start or at the end of a cycle,
depending on the requirement of the operator.
0
Waiting phase
1
Fill phase
2
Stabilization phase
3
Test
4
Dumping