QSG_F670_363.00_EN_01_2021-02-09
33/42
Starting up
POWER UP
1. Make sure that all the necessary connections are in
place.
Electrical: such as power supply, inputs/outputs.
Pneumatic: including line pressure supply.
2. Power up your device.
When power-up is completed, the
Program
screen is
displayed, with last program used on screen.
PREPARING A PROGRAM
Use this procedure to configure a new test program.
On the
MAIN MENU
screen:
ACCESSING THE PARAMETERS
1.
Select
PARAMETERS
using the
up/down
keys and then press
.
The program list is displayed.
SELECTING A PROGRAM NUMBER
2.
Select the program to configure and press
.
A list of the available measurement types is displayed:
—
LEAK TEST
type
—
BLOCKAGE
type (option)
—
DESENSITIZED TEST
type (option)
—
OPERATOR
type (option)
—
BURST TEST
type (option)
—
VOLUME
type (option)