3. Place the bottom aluminum rail on the floor with correct orientation up to
receive the glass panel.
4. Apply a liberal bead of sealant on the bottom rail from the slot that receives
the glass panel out to the end of the rail.
NOTE:
The next steps of assembly will require two people.
5. Choose the left side glass panel and insert it into the left slot on the bottom
rail.
6. While holding the left panel insert the right panel into the right side slot.
7. Take the top aluminum rail and apply a liberal bead of sealant from the slot
for the glass panel out to the end of the rail.
8. Line up the slot on the top rail with the receiving tabs on the glass panels and
insert the top rail on to the glass panels.
9. Using the screws and washers from
Screw Pack 3
follow the diagram to
insert the correct screw length in to the correct location.
10. Start with the corners of the glass panel assembly then proceed to insert the
screws into the top and bottom of the assembly.
11. After all the screws are in place and secure, wipe any excessive sealant and
use the excess to fill any cracks or gaps between the joints.
Depending on your unit, you may or may not have an additional glass side panel.
When installing this side panel, apply a bead of sealant on the inside corner joint
before assembly and then wipe away the excess.
16