failure. If continuity is present, high voltage is applied to both conductors of the line
cord to insure that all current carrying conductors in the primary circuit are tested.
When testing products with two prong plugs, do not activate the continuity circuit.
When the Ground Bond test is selected on the QUADCHEK II the High Current will
be applied through the Current lead to the Adapter box and flow back through the
Return lead. The resistance is measured and compared to the HI and LO- Limit trip
points stored in memory.