![Associated Research HypotULTRA II 7500DT Operation And Service Manual Download Page 34](http://html1.mh-extra.com/html/associated-research/hypotultra-ii-7500dt/hypotultra-ii-7500dt_operation-and-service-manual_2989479034.webp)
INSTALLATION
30
3). Use a layer of shock-absorbing material 70 to 100 mm (3 to 4 inch) thick around all
sides of the instrument. Protect the control panel with cardboard.
4). Seal the container securely.
5). Mark the container "FRAGILE" to insure proper handling.
6). Please refer in all correspondence to your AR service number.
Field Installation Of Options
There are no field installable options on this instrument.