![ASG OM Series Manual Download Page 8](http://html.mh-extra.com/html/asg/om-series/om-series_manual_2981860008.webp)
ASG, Division of Jergens, Inc.
15700
S. Waterloo Road | Cleveland, OH 44110-3898 | Phone: (888) 486-6163 | Fax: (216) 481-4519 | Email: [email protected] | Web: www.asg-jergens.com
8
Adjustments and Checks before Use (Continued)
Basic Operations
Loading the Screws
• Turn the power switch ON and OFF so that the brush stops vertically above the
rail.
• Open the top cover and load screws on the left and right side of the rail evenly.
• Do not load screws above the surface of the rail.
CAUTION:
Screws with a diameter larger than 5mm or longer than 20mm
under the head should not be loaded higher than the rail bottom.
• The type and length of screw changes the load capacity so check and adjust the
load accordingly.
• Do not overload the hopper with screws otherwise it may cause a malfunction or
damage the machine.
• This machine accepts only steel screws. Plastic or stainless screws are not
accepted.
Turning ON the Power
• Use only the adapter supplied with this machine to connect it to a wall outlet.
When you turn the power on, the switch lamp lights up, the motor rotates, and
screws are brushed onto the rail.
• The rail vibrates to deliver screws toward the end of the rail, then the escape
rotates to deliver screws to the pick-up location. When the screws come to the
stopper, the LED indicator lights up and the escape stops rotating.
• CAUTION:
Use only the AC adapter supplied with this machine otherwise it may
cause damage to the machine.
!