3 - 4
The Control Room
The control room houses the cabinets containing the load bank switchgear, the external
power supply sockets, a number of local controls and connectors for external equipment.
At the rear of the control room is a console, which provides a desktop surface for laptop
computers, monitoring equipment, etc.
Figure 3-1
8800 load bank control room layout.
Chapter Three
© NJ Froment & Co. Ltd. This document may not be copied
or disclosed in whole or part without prior written authority.
1
2
3
4
5
6
7
8
9
10
11
12
13
6
14
15
16
13. RCD
14. Lighting on/off switch
15. The fan and control supply isolator
16. Fuses for external fan & control supply
7. Sigma control system in/out connections
8. Air vents: Ensure this is not obstructed
9. Reset button
10. Instrumentation selection switch
11. RMU closed
12. Bund Warning
1. Load bank system monitor
2. Emergency stop button
3. Start button
4. HV instrumentation stop/warning
5. HV instrumentation run
6. Socket outlets