Load Bank Operation
3 - 3
Controlling the load bank
The control room switches allow the load bank’s instrumentation (see figure 3-1 point 10)
to be selected, and provide local on/off control and manual emergency shutdown. However,
during load testing the load bank is controlled using the Sigma 2 load control system.
Alternatively, the load bank may be controlled with third party software using the HMI
ethernet output.
You can find full instructions for the use of the Hand-held in Chapter Four of this manual.
For instructions on using the Sigma PC Load Control Software refer to the application’s
built-in help system.
Modbus control is beyond the scope of this manual. If you need more information please
contact the Froment technical support department.