Table of Contents
Transporting Froment 8800 S
ERIES
Load Banks
2 - 4
•
Lifting by crane or hoist
•
Transport
•
Storage
•
Packaging
Installing
Froment
Load
Banks
2
-
5
•
Location
•
Sound attenuators
•
Avoiding hot air re-circulation
Electrical
Installation
2
-
8
•
Voltage and frequency ratings
•
Connecting the external supply
•
Anti-condensation heaters and lighting supply
•
Connecting the Supply-on-Test
•
Supply-on-test general points
Control
System
Connections
2
-
15
•
High Voltage (HV) instrumentation mode
•
Low Voltage (LV) instrumentation mode
•
System monitor control
•
Optional remote connections
Commissioning
2
-
14
Chapter Three - Load Bank Operation
Before Operating the Load Bank
3 - 2
•
Safety warning
Controlling
the
Load
Bank
3
-
3
The
Control
Room
3
-
4
•
The external power inlet compartment
•
Main control panel
•
System monitor
•
Operating the ring main unit (RMU)
•
Status indicator lamp operation
•
Fault indicators
Emergency
Shutdown
Procedures
3
-
11
Load
Function
Test
3
-
12
Load Bank Operation using a Remote Control
3 - 15
iii