25
5.0
SETTING UP NEXUS/STYLUS
7. Align the UCU-T containing the UCU-H with the underside of the counter.
8. Connect expansion line (silicon pipe clear) to copper tube located on the rear lower section of the
UCU-H. Feed line from the copper tube connection to the buildings waste pipe.
Note: The silicon tube should be fixed into position securely to prevent possible leaks from
occuring.
9. Connect steam–IN, group 1, 2, and 3, hot water, steam-OUT hydraulic Teflon lines from CTU to UCU-H
using corresponding labels on tubes.
10. Connect water supply line from PUMP-UCU-P to UCU-H through the 3/8 BSP connection fitting
located on rear of UCU-H (remove transit blanking plug to access).
STEAM IN
STEAM OUT
HOT WATER
GROUP 2
GROUP 1
Summary of Contents for NEXUS
Page 1: ...Nexus Stylus USER MANUAL NEXUS STYLUS USER MANUAL 2 GROUP 3 GROUP ENGLISH ...
Page 6: ...6 This page has been left intentionally blank ...
Page 14: ...14 4 0 IDENTIFYING COMPONENTS 4 1 Nexus Stylus ...
Page 51: ...51 8 0 OPERATING WEXUS NEXUS MODELS ONLY 8 2 1 Brewing Mode ...
Page 52: ...52 8 0 OPERATING WEXUS NEXUS MODELS ONLY 8 2 2 Target Set Mode ...
Page 77: ...77 This page has been left intentionally blank ...
Page 80: ......