23
ZR-165
NOTE: When securing the governor control shaft
(A), turn it clockwise until it stops; then tighten the
control arm cap screw (B) to 72 in.-lb.
ZR-163
26. Add 600 ml (20.3 fl oz) of the recommended engine
oil to the engine.
Installing
1. Secure the engine mounts to the bottom of the engine
using the four cap screws (threads coated with blue
Loctite #243) and washers. Tighten to 18 ft-lb.
ONS-032
NOTE: The cap screws must be positioned to the
arrow side of the holes in the crankcase.
ONS-033
ONS-034
2. Place the engine assembly into position in the engine
compartment.
3. Loosely secure the engine to the chassis using new
lock nuts. Do not tighten at this time.
ONS-031
4. Loosely secure the torque bumper assembly to the
engine using existing three cap screws and three
washers. Do not tighten at this time.
Summary of Contents for 2018 ZR 200
Page 1: ......
Page 66: ...65 Wiring Diagram 0752 220 ...
Page 67: ...66 NOTES ...
Page 68: ...67 NOTES ...
Page 69: ...68 NOTES ...
Page 70: ......