6.
Remove the small card box insert that contains some ship kit items from the top
foam cutout and put in a safe place.
7.
Remove the top foam insert piece and retain for future use if desired.
8.
For CFS108:
a.
Stand as close to the back of the box (where the rear panel of the unit is)
and bend with your knees.
b.
Get a firm hand hold underneath the units by placing your hands on each
side of the unit near the middle. This will help even the weight when lifting.
c.
While keeping your back straight, lift the unit out of the box by straightening
your legs.
d.
Place the unit on the intended staging surface, usually a bench or table.
9.
For CFS116:
a.
Two people are required.
b.
Have each person stand as close to the front and the back of the box and
bend with your knees.
c.
Each should get a firm hand hold underneath the unit by placing their hands
on each side of the unit near the front and back of the unit respectively. This
will help divide the weight between both persons when lifting.
d.
While keeping their backs straight, lift the unit out of the box
simultaneously by straightening legs.
e.
Place the unit on the intended staging surface, usually a bench or table.
5.2.2
Unpacking CFS140 Models
WARNING
THE CFS140 WEIGHT APROXIMATELY 64.8 Kg / 143 lbs. AT LEAST
TWO PEOPLE ARE REQUIRED TO LIFT AND HANDLE
The CFS140 is shipped on a small pallet or skid. A cardboard cover with protective foam
insert is placed over the unit to protect it during shipment.
Note:
This is not a complete box with top and bottom flaps. There is no bottom so you
cannot lift the carton from the pallet.
To remove a CFS140, two persons
MUST
be used at all times.