![APS CFS108 Operation Manual Download Page 134](http://html1.mh-extra.com/html/aps/cfs108/cfs108_operation-manual_2956870134.webp)
CFS100 SERIES OPERATION MANUAL
SECTION 10: CALIBRATION
Entire Contents Copyright
2016 by Adaptive Power Systems, Inc. (APS) • All Rights Reserved • No reproduction without written authorization from APS.
APS CFS100 Series Power Source Operation Manual
Page 134 of 146 PN 160951-10
Verify “115” Volts DC Offset
1.
Connec
t the 475kΩ resistor in series with the 10uF capacitor and connect the DVM
and load to the instrument as illustrated in the following diagram:
R 475kΩ
C 10uF
Figure 10-1: DC Offset Measurement
2.
Set the DVM to read DC mV.
3.
Set the output voltage to 115V in the AUTO voltage mode.
4.
Push the output button and wait twenty seconds to take a measurement.
5.
Verify that the DVM measures 0V +\- 100mV.
6.
Disconnect the load and the DVM.
Exit Verification Mode by turning the power OFF and then back ON. This returns it to normal
operation mode.
This completes the verification process.
Summary of Contents for CFS108
Page 145: ......