
3-7 Low-Band Calibration
Using the 2300-584-R Software with the ME7838E
3-18
PN: 10410-00286 Rev. L
3656B W1 Cal/Ver Kit & 2300-584-R PVS UG
3-7
Low-Band Calibration
During this procedure, the low-band portion of the VNA is calibrated with a full 12-term SOLT
(Short-Open-Load-Thru) calibration. In
Section 3-8 “High-Band Calibration” on page 3-20
, the high-band
portion of the VNA is calibrated with a full 12-term SSST (Short-Short-Short-Thru) calibration.
Procedure
1.
The
W1 Verification Install Adapter
dialog box appears.
a.
Install a F-F adapter on VNA Port 1 so that a Female connector is available to the operator.
b.
Install a F-M adapter on VNA Port 2 so that a Male connector is available to the operator.
c.
When ready to proceed, click
OK
.
2.
The
VNA Calibration: Step 1 of 5
dialog box appears.
a.
Connect the Male Cal Kit Isolation Device to VNA Port 1.
b.
Connect the Female Cal Kit Isolation Device to VNA Port 2.
c.
When ready to proceed, click
OK
.
Figure 3-23.
Anritsu W1 Verification Dialog
Figure 3-24.
VNA Calibration: Step 1 of 5 Dialog
Summary of Contents for 3656B W1
Page 2: ......
Page 12: ...Contents 10 PN 10410 00286 Rev L 3656B W1 Cal Ver Kit 2300 584 R PVS UG...
Page 277: ......