Installation and start-up
contrAA 600
Edition 01/2014
37
1
Connection for furnace camera/PC
2
Free USB connection
3
Connection for contrAA 600/PC
4
Free COM connection for accessories
5
Connection contrAA 600/PC (for service only)
6
Xenon lamp fuses F7/F8 T 3,15 A
7
Autosampler connection AS-FD, AS-F
8
Connection AS-GF
9
Connection for solid autosampler SSA 600
10
Connection for hydride system
11
External mobile cooling unit (free)
Fig. 18
Bar for supply and control connections
1
Carrier gas connection (argon)
2
Additive gas connection (standard: argon)
3
Fuses F5, F6
4
Mains connection for accessories (5-way
multiple adapter)
5
Fuses F3, F4
6
Fuses F1, F2 (encapsuled)
7
Main connection line for contrAA 600
Fig. 19
Rear view of the contrAA 600 with connections for the supply of gas and electrici-
ty as well as the fuse holders
6.2
Setting up the contrAA 600
CAUTION! ONLY SERVICE ENGINEERS ARE ALLOWED TO INSTALL
THE DEVICE!
The device may only be installed by service engineers from Analytik Jena AG or by technical
personnel authorized by Analytik Jena AG.
CAUTION!
Ensure that installation conditions are guaranteed in the new installation area!
See Chapter "Installation conditions" p. 18.
Observe the instructions in Chapter "Safety instructions" p. 6.
Observe work protection regulations. Warnings regarding potential danger do not replace
valid work protection regulations!
1.
Unscrew and remove the four handles and keep in a safe place.