Installation and start-up
38
Edition 01/2014
contrAA 600
2.
Seal the openings with stoppers.
3.
Install the gas supply:
Slide the argon tube onto the tube coupling.
4.
Check the gas connection for leaks (
→
Section "Supply and control connections" p.36).
5.
Check the cooling water and refill if necessary (
→
Section "Check the cooling water
6.
Establish the electrical connection for the contrAA 600 (
→
Section "Energy supply" p.
7.
Connect the PC and the contrAA 600 with USB cable (3 in Fig. 18).
8.
Further work steps:
−
Install ASpect CS software
−
Complete contrAA 600 according to the desired atomization technique
6.3
Installation and start of the ASpect CS program
For the installation and start of the ASpect CS program, which is required for controlling the
spectrometer, refer to the manual "ASpect CS."