Installation
7
10.4" Touch Panels
5.
Remove the CB-TP3 and drill four #6-32 insert holes. Then, place a threaded insert (or screw
anchor) into each hole.
6.
Disconnect the AXlink connector from the Central Controller, RS-232 connector, and the
optional graphic/video wiring from the source equipment.
7.
Remove one or more knockouts to accommodate the wiring as required.
8.
Thread the incoming AXlink, RS-232 connector, and the optional graphic/video wiring
through the CB-TP3 knockouts. Refer to
Wiring the Touch Panel
section on page 8 for more
information.
9.
Fasten the CB-TP3 to the plasterboard using the expansion screws supplied with the enclosure.
10.
Connect the AXlink, RS-232, and the optional graphic/video wiring to the touch panel.
11.
Test the connection by reconnecting the AXlink connector to the Central Controller and the
optional video wiring to the video equipment. The panel beeps on power-up. Before
continuing, disconnect all connections until panel installation is complete.
12.
Fasten the touch panel to the CB-TP3 with the #6-32 screws supplied with the panel.
13.
Place the Decor-style faceplate onto the bezel. You can also secure the faceplate to the bezel
using the four Phillips flat-head security screws.
FIG. 5
Decor style (AXD) and CB-TP3 cutout dimensions for plasterboard
Summary of Contents for AXD-CA10
Page 1: ...instruction manual Touch Panels and Accessories 10 4 Touch Panels Firmware version G3 ...
Page 17: ...Installation 13 10 4 Touch Panels ...
Page 18: ...Installation 14 10 4 Touch Panels ...
Page 28: ...Designing Touch Panel Pages 24 10 4 Touch Panels ...