16
Amico Clinical Solutions Corp.
Installing The Flanged Ceiling Tube
!
WARNING – Risk of Flanged Ceiling Tube dropping:
• If the flanged ceiling tube drops, it may cause serious injury.
• During installation, nobody is allowed to stand under the flanged ceiling tube.
• If your extension arms have stops, you will want to determine the limit of rotation. It is preferred to mark
this limit and determine where the limit in the operating room would best be suited.
1. First fit the threaded rods with the necessary components between the anchor plate and the flanged ceiling drop
tube.
2. Push the flanged ceiling tube onto the six M16 threaded rods of the anchor plate.
3. Secure the flanged ceiling tube with two M16 hex nuts:
NOTE: Precise horizontal alignment of the flanged ceiling tube is essential to ensure that the pendant system can
be removed easily and positioned reliably.
4. Complete the assembly by installing the rest of the hex nuts, flat washers and lock washers to the threaded rods.
5. Align the flanged ceiling tube horizontally by adjusting the M16 hex nuts. Check the horizontal alignment.
Installation: Structure Plates and Flanged Ceiling Tube
Item
Description
1
6 x M16 Threaded Rods
2
24 x M16 Lock Washers
3
24 x M16 Flat Washers
4
Flanged Ceiling Tube
5
36 x M16 Hex Nuts