
Adjustments
94
ZA-V BAG0087.11 01.20
8.4
Spread rate check
See operating manual for the ISOBUS software / Calibrate fertiliser
section.
Alternatively, the spread rate check is:
ZA-V Profis
•
carried out at the beginning of the spread-
ing process (the calibration factors are
measured while spreading the first 200 kg
of fertiliser).
→
Machine data menu:
Calibration procedure switch on offline cali-
bration.
→
Work menu: select Automatic fertiliser cali-
bration
•
carried out continually throughout the
spreading process (online calibration).
→
Machine data menu:
Calibration procedure switch on online cali-
bration
ZA-V
•
performed with the calibration device while
stationary before operation.
→
The fertiliser flowing out is collected and
weighed
Fig. 57
•
performed with the fertiliser chute on the left
shutter while standing still before operation.
→
The fertiliser flowing out is collected and
weighed.
Fig. 58
Always perform a spread rate check
with the fertiliser chute for slug pellets
or fine seeds.
Summary of Contents for ZA-V
Page 135: ...ZA V BAG0087 11 01 20 135 13 Hydraulic diagram ZA V Hydro Fig 80 ...
Page 136: ......