
Cleaning, maintenance and repair
Pump test - testing pump performance (delivery capacity, pressure)
1. Undo the sleeve nut (Fig. 189/1).
2. Attach the hose connection.
3. Tighten the sleeve nut.
Fig. 189
Flow meter test
1. Remove all spray lines from the part width
section valves (Fig. 190/1).
2. Connect the flow meter connection (Fig.
188/2) to a part width section valve and
connect to the tester.
3. Block the connections for the remaining part
width section valves using blanks (Fig.
188/1).
4. Switch on spraying.
Fig. 190
Pressure gauge test
1. Remove a spray line from a part width section valve.
2. Connect the pressure gauge connection (Fig. 188/3) to a part
width section valve with the help of the turned socket.
3. Screw the check gauge 1/4 of an inch into the inside thread.
4. Switch on spraying.
12.19
Electric lighting system
Replacement of light bulbs:
1. Unscrew the safety glass.
2. Remove the defective bulb.
3. Insert the replacement bulb (note the correct voltage and watt-
age).
4. Insert and screw on the sight glass.
226
UX Super
BAG0054.10 11.16